A National Study on Leveraging Public Infrastructure Funds: Project Performance and Financing Source Analysis for Public-Private Partnerships (PPP) in the U.S. Transportation Sector.

机译:一项关于利用公共基础设施资金的国家研究:美国运输业中公共-私人合作伙伴关系(PPP)的项目绩效和融资来源分析。

获取原文
获取原文并翻译 | 示例

摘要

Transportation systems in the U.S. are in a poor state of disrepair. A significant investment is needed to replace or rehabilitate current transportation infrastructure. Currently, transportation investments are lackluster with the recession of 2008 heavily impacting transportation spending, inciting deficits and budgetary cuts at state and federal government levels. As a result, policy makers and public officials are increasingly looking for innovative financing and alternative delivery methods to supplement traditional financing and delivery for transportation projects. Subsequently, the number of public-private partnerships (PPP or P3) has increased substantially over the last two decades.;There is a growing need to quantify the project performance and financial benefits of PPP. This dissertation fills this gap in knowledge by performing a comprehensive quantitative analysis of PPP project performance and financial sources for transportation projects in the U.S. This study's specific research objectives are:;(1) Develop a solid baseline for comparison, comprised of non-PPP projects; (2) Quantify PPP project cost and schedule performance; and (3) Quantify private versus public financing sources of PPP.;A thorough literature review led to the development of a structured data collection process for PPP and comparable non-PPP projects. Financing data was collected and verified for a total of 133 ongoing and completed projects; while performance data was verified for a subset of 81 completed projects. Data analysis included regression analysis, descriptive statistics, inferential statistics and non-parametric statistical tests.;The results provide benchmarks for PPP project performance and financing sources. For the performance results, non-PPP projects have an average cost change of 8.46 percent and an average schedule change of -0.22 percent. PPP projects have an average cost change of 3.04 percent and average schedule change of 1.38 percent. Statistical analysis showed cost change for PPP projects were superior to that of non-PPP; however, schedule change differences were not significant. For the financing results, private financing totaled 44.5 percent while public financing totaled 55.5 percent. This result shows private financing can be used to leverage public financing with close to a one-to-one ratio and that PPP has the potential to double the amount of infrastructure delivered to the public.
机译:美国的运输系统处于严重的失修状态。需要大量投资来替换或修复当前的交通基础设施。当前,运输投资表现不佳,2008年的衰退严重影响了运输支出,引发了州和联邦政府层面的赤字和预算削减。结果,决策者和政府官员越来越多地寻求创新的融资和替代交付方式,以补充运输项目的传统融资和交付方式。随后,在过去的二十年中,公私伙伴关系(PPP或P3)的数量大幅度增加。本论文通过对美国运输项目的PPP项目绩效和财务来源进行全面的定量分析,填补了这一知识空白。本研究的具体研究目标是:(1)为非PPP项目制定可靠的比较基准; (2)量化PPP项目的成本和进度绩效; (3)量化PPP的私人融资来源与公共融资来源。收集并核实了总共133个进行中和已完成项目的融资数据;同时验证了81个已完成项目的子集的性能数据。数据分析包括回归分析,描述性统计,推论统计和非参数统计检验。结果为PPP项目的绩效和融资来源提供了基准。对于绩效结果,非PPP项目的平均成本变化为8.46%,平均进度变化为-0.22%。 PPP项目的平均成本变化为3.04%,平均进度变化为1.38%。统计分析表明,PPP项目的成本变化优于非PPP项目;但是,时间表更改差异并不明显。就融资结果而言,私人融资总计占44.5%,而公共融资总计占55.5%。该结果表明,私人融资可用于以接近一对一的比率杠杆化公共融资,并且PPP有可能使交付给公众的基础设施数量翻倍。

著录项

  • 作者

    David Wayne, Ramsey, III.;

  • 作者单位

    Arizona State University.;

  • 授予单位 Arizona State University.;
  • 学科 Civil engineering.
  • 学位 Ph.D.
  • 年度 2016
  • 页码 176 p.
  • 总页数 176
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 11:40:21

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号