...
首页> 外文期刊>Journal of financial management of property and construction >Factors hindering effective partnering in Indian public sector construction organizations
【24h】

Factors hindering effective partnering in Indian public sector construction organizations

机译:阻碍印度公共部门建筑组织有效合作的因素

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Purpose - The Indian public sector construction industry is normally driven by traditional contracting practices. Though no formal partnering agreement is being used in public sector projects in India, improvement in Indian public sector organizations could be observed in the post-liberalization era, as they get the opportunities to work with multinational companies from countries with experiences in partnering. The purpose of this study is to explore the extent of partnering strategies being adopted by Indian public sector organizations and identify factors hindering the adoption of formal partnering. Design/methodology/approach - Critical success factors for successful partnering were first identified through literature review. This guided the collection of primary data through semi-structured interviews with 36 top management personnel and secondary data in the form of organizational documents and site reports from several site visits of four public sector construction organizations. The evidence collected from four cases were arranged and compared against organizational strategies of successful partnering. Findings - Most of the strategies adopted by the organizations were found to be in line with the suggested partnering practices. However, partnering performance of these organizations was found to be not satisfactory. This study has identified 14 factors hindering effective partnering such as reservations over joint risk-sharing process, limited bid evaluation criteria, difficulty in time-bound payment to contractor, absence of incentive mechanism, obsolete training procedures and absence of time-bound dispute resolution mechanism. Research limitations/implications - The research findings are based on a case study with four public sector organizations only. Additional cases need to be undertaken to generalize the findings. Further study should also be undertaken to explore partnering relationships between contractors and subcontractors in public sector projects. Practical implications - To improve project performance, top management of public sector organizations in India can take these factors into account while formulating strategies on introduction of project partnering in their organizations. Originality/value - The work is novel providing insights into organizational strategies promoting and hindering partnering in Indian public sector construction organizations.
机译:目的-印度公共部门的建筑业通常由传统的承包经营方式驱动。尽管印度的公共部门项目中未使用正式的合作协议,但在自由化后的时代,印度的公共部门组织得到了改善,因为它们有机会与具有合作经验的国家的跨国公司合作。这项研究的目的是探讨印度公共部门组织采用的合作策略的范围,并找出阻碍采用正式合作伙伴关系的因素。设计/方法/方法-成功合作的关键成功因素首先是通过文献综述确定的。这指导了通过对36位高层管理人员进行半结构化访谈的方式来收集主要数据,并以组织文件和来自四个公共部门建筑组织几次实地访问的现场报告的形式提供了次要数据。整理了从四个案例中收集的证据,并与成功合作的组织策略进行了比较。调查结果-发现组织所采用的大多数策略都符合建议的合作伙伴做法。但是,发现这些组织的伙伴关系表现不令人满意。这项研究确定了14个阻碍有效合作的因素,例如对联合风险分担程序的保留,有限的投标评估标准,难以及时支付给承包商的费用,缺乏激励机制,过时的培训程序以及缺乏有时限的争议解决机制。研究的局限性/意义-研究结果仅基于对四个公共部门组织的案例研究。需要进行其他案例以概括发现结果。还应该进行进一步的研究,以探索公共部门项目中承包商与分包商之间的合作关系。实际意义-为了提高项目绩效,印度公共部门组织的高层管理人员可以在制定有关在组织中引入项目合作伙伴关系的策略时考虑到这些因素。原创性/价值-这项工作很新颖,提供了有关促进和阻碍印度公共部门建筑组织合作的组织策略的见解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号