The purpose of this study is to identify, describe, and analyze the conflict avoidance process, partnering. This study used the perceptions of key participants to describe the actual process and to compare it with the prevalent theoretical model. This model was developed by Carr et al. (1999) for the purpose of documenting the dispute prevention process used by the United States Army Corps of Engineers and others over the last decade.; A qualitative research design was used to purposefully select four partnered construction projects in the Commonwealth of Virginia. The four different construction projects conformed to the Virginia Public Procurement Act (VPPA). They all used the same state form of Contract for Construction and General Conditions of the Contract. The method of procurement, although different for each project, conformed to the VPPA and were: (a) two low bid projects; (b) one construction management project; and (c) one design/build project.; The Architect/Engineer, the Owner, the General Contractor, and the Facilitator on each construction project were interviewed to determine their perceptions of the partnering process. The perceptions of these key informants were used in this research.; The four major findings of this study are: (1) The operational model of the partnering process as described by the key informants is different from the foreshadowed concept, or model, of the partnering process of Carr et al. (1999). (2) Partnering is successful for conflict avoidance in all of the projects. (3) The commitment of the participants to make partnering work is instrumental to the success of partnering. (4) The activities of (a) gaining management support, (b) observing the common goals, (c) keeping the commitment to partnering with mutual trust, respect, and honesty without personal agendas, and (d) working together to solve problems cooperatively are key contributors of partnering.; The model of the partnering process derived from the interviews depicts a different structure than the theoretical model. This model includes three sets of events in its process with four independent steps in the first event, four sequential steps in the second event, and two independent steps in the third event. This is compared with the foreshadowed theoretical model of the partnering process that contains six linear sequential steps.; Implications for theory, practice, and future research are also discussed. The implications for theory suggest that the operational model is a more complex model than the foreshadowed theoretical process model of Carr et al. (1999). The implications for practice suggests that Virginia should recognize partnering and engage it as a procedure on its construction projects. The implications for future research suggests the replication of this study in other states would test its applicability under which contractual provisions which are different from those of Virginia.
机译:这项研究的目的是确定,描述和分析避免冲突的过程,建立伙伴关系。这项研究使用主要参与者的看法来描述实际过程,并将其与流行的理论模型进行比较。该模型由Carr等人开发。 (1999),目的是记录在过去十年中美国陆军工程兵团和其他机构所采用的预防纠纷程序。定性研究设计用于有目的地选择弗吉尼亚联邦的四个合作建筑项目。四个不同的建设项目符合《弗吉尼亚公共采购法》(VPPA)。他们都使用了相同的州形式的施工合同和合同的一般条件。尽管每个项目的采购方法不同,但采购方法符合VPPA,并且是:(a)两个低价项目; (b)一个建筑管理项目; (c)一个设计/建造项目。对每个建筑项目的建筑师/工程师,业主,总承包商和协调人进行了访谈,以确定他们对合作过程的看法。这些关键线人的看法被用于这项研究。这项研究的四个主要发现是:(1)关键知情者描述的伙伴关系过程的运营模型与Carr等人所设想的伙伴关系过程的模型或模型不同。 (1999)。 (2)为避免所有项目中的冲突,合作成功。 (3)参与者对开展合作工作的承诺对成功合作至关重要。 (4)(a)获得管理支持,(b)遵守共同目标,(c)保持在没有个人日程的情况下相互信任,相互尊重和诚实合作的承诺,以及(d)共同解决问题的活动合作是伙伴关系的主要贡献者。从访谈中得出的合作过程模型描述的结构与理论模型不同。该模型在其过程中包括三组事件,第一个事件中包含四个独立步骤,第二个事件中包含四个顺序步骤,而第三个事件中包含两个独立步骤。将其与包含六个线性顺序步骤的合作过程的理论模型进行了比较。还讨论了对理论,实践和未来研究的影响。对理论的启示表明,与Carr等人所预言的理论过程模型相比,操作模型是一个更为复杂的模型。 (1999)。实践的含义表明,弗吉尼亚州应认识到合作伙伴,并将其作为其建设项目的一个程序。对未来研究的影响表明,该研究在其他州的复制将检验其适用性,该合同规定与弗吉尼亚州不同。

著录项

  • 作者

    Fisher, Richard Barnard.;

  • 作者单位

    Virginia Commonwealth University.;

  • 授予单位 Virginia Commonwealth University.;
  • 学科 Political Science Public Administration.; Architecture.; Engineering General.
  • 学位 Ph.D.
  • 年度 2004
  • 页码 300 p.
  • 总页数 300
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 政治理论;建筑科学;工程基础科学;
  • 关键词

  • 入库时间 2022-08-17 11:44:07

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号