Benefits of owner mandated CM/GC contract amendment templates

机译:所有者授权的CM / GC合同修订模板的好处

获取原文
获取原文并翻译 | 示例

摘要

Purpose - The purpose of this paper is to explore how implementing a standardized/owner-mandated template for Construction Manager/General Contractor (CM/GC) contract amendments can minimize errors. The focus is on public owners who manage multiple CM/GC projects at any one time. Design/methodology/approach - A case study format was used to compare contract amendments errors using a baseline project, transition project and best practices project. Six metrics were identified, including factual recital errors, summary formatting errors, schedule of values errors, construction services fee errors, allowance schedule errors and data consistency errors. Findings - The baseline and transition projects both had an average of seven errors per amendment, while the best practices project produced zero errors. The amendment template creation process helped design out common errors. The use of the template can be contract-mandated, while transition projects require owner commitment. Research limitations/implications - Future research should focus on completed projects' closeout data that have been consolidated since the transition project was in its final stage and the best practices project was relatively early in the construction process. Practical implications - The findings of this research indicate that by implementing a mature owner-mandated CM/GC contract amendment template, owners can greatly reduce errors that arise during the amendment process. It should be noted, however, that challenges will most likely occur during the implementation phase. Originality/value - No similar studies were found and the results of the research informs Facilities Management departments that they can significantly reduce errors by utilizing a mature, owner-mandated template for CM/GC contract amendments.
机译:目的-本文的目的是探讨为施工经理/总承包商(CM / GC)合同修正案实施标准化/所有者授权的模板如何最大程度地减少错误。重点是可以同时管理多个CM / GC项目的公共所有者。设计/方法/方法-案例研究格式用于比较使用基线项目,过渡项目和最佳实践项目的合同修订错误。确定了六个指标,包括事实陈述错误,摘要格式错误,价值明细表错误,建筑服务费错误,津贴明细表错误和数据一致性错误。调查结果-基线和过渡项目的每个修订平均都存在七个错误,而最佳实践项目则产生了零错误。修订模板创建过程有助于设计出常见错误。可以强制使用模板,而过渡项目需要所有者承诺。研究的局限性/含意-未来的研究应关注自过渡项目进入最后阶段以来,已整合的已完成项目的结算数据,而最佳实践项目则处于建设过程的早期。实际意义-这项研究的结果表明,通过实施成熟的所有者要求的CM / GC合同修订模板,所有者可以大大减少修订过程中出现的错误。但是,应当指出,挑战很可能会在实施阶段发生。原创性/价值-没有发现类似的研究,研究的结果通知设施管理部门,他们可以通过使用成熟的,所有者授权的CM / GC合同修订模板来显着减少错误。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号