首页> 外文期刊>Journal of environment informatics >Planning Water Resources Systems under Uncertainty Using an Interval-Fuzzy De Novo Programming Method
【24h】

Planning Water Resources Systems under Uncertainty Using an Interval-Fuzzy De Novo Programming Method

机译:使用区间模糊从头规划法规划不确定性下的水资源系统

获取原文
获取原文并翻译 | 示例

摘要

This study presents an interval-fuzzy De Novo programming (IFDNP) method for planning water-resources-management systems under uncertainty. IFDNP is derived by incorporating the concepts of interval parameters and fuzzy sets within a De Novo programming framework. IFDNP has the advantages in constructing optimal system design through introducing the flexibility into the available resources in the model's constraints. Moreover, IFDNP allows the decision makers to achieve a metaoptimal system performance and improve the performance of compromise solutions, and it is effective for dealing with the system design problems involving multiple objectives and multiple uncertainties. The IFDNP is then applied to a case study of designing an inexact optimal system with budget limit for water resources management and planning. Various scenarios that are associated with different levels of economic implication consequences and water allocation patterns under uncertainty are analyzed. Results can help decision makers to evaluate alternatives of system designs and to determine which of these designs can most efficiently achieve the desired economic objective constrained by limited resources.
机译:这项研究提出了一种不确定性下的间隔模糊De Novo编程(IFDNP)方法,用于规划水资源管理系统。通过将间隔参数和模糊集的概念纳入De Novo编程框架,可以得出IFDNP。通过将灵活性引入模型约束中的可用资源,IFDNP在构建最佳系统设计方面具有优势。此外,IFDMP使决策者能够实现亚最佳系统性能并提高折衷解决方案的性能,并且对于处理涉及多个目标和多个不确定性的系统设计问题非常有效。然后,将IFDNP应用于案例研究,该案例设计了一个预算有限的不精确最优系统,用于水资源管理和规划。分析了与不确定性下不同程度的经济隐含后果和水分配模式相关的各种情景。结果可以帮助决策者评估系统设计的替代方案,并确定其中哪些设计可以最有效地实现有限资源约束下的预期经济目标。

著录项

  • 来源
    《Journal of environment informatics》 |2014年第1期|11-23|共13页
  • 作者单位

    MOE Key Laboratory of Regional Energy Systems Optimization, Resources and Environmental Research Academy, North China Electric Power University, Beijing 102206, China,School of Environment, Beijing Normal University, Beijing 100875, China;

    Department of Civil Engineering, McMaster University, Hamilton, Ontario L8S 4L7, Canada;

    MOE Key Laboratory of Regional Energy Systems Optimization, Resources and Environmental Research Academy, North China Electric Power University, Beijing 102206, China;

    School of Environment, Beijing Normal University, Beijing 100875, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    De Novo programming; fuzzy sets; interval analysis; multiobjective; planning; water resources systems;

    机译:从头编程;模糊集间隔分析;多目标规划;水资源系统;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号