首页> 外文期刊>Journal of Construction Engineering and Management >Time-Cost Relationships in Australian Building Construction Projects
【24h】

Time-Cost Relationships in Australian Building Construction Projects

机译:澳大利亚建筑工程中的时间成本关系

获取原文
获取原文并翻译 | 示例
           

摘要

Project time-cost relationships were examined by using project scope factors as predictors for 161 construction projects that were completed in various Australian States using the multiple regression technique of weighted least squares. The analysis was performed between project duration (i.e., time), project type, procurement method, tender type, gross floor area (GFA), and number of stories. An alternative model to that proposed by Bromilow more than three decades ago for forecasting time and cost performance is proposed. It is shown that GFA and the number of stories in a building are key determinants of time performance in projects. Furthermore, the results indicate that cost is a poor predictor of time performance. Limitations and practical implications of the research are also presented.
机译:通过使用项目范围因子作为161个建筑项目的预测指标,检查了项目时间成本关系,这些项目在澳大利亚各个州使用加权最小二乘多元回归技术完成。分析是在项目工期(即时间),项目类型,采购方法,招标类型,总建筑面积(​​GFA)和层数之间进行的。提出了Bromilow三十多年前提出的用于预测时间和成本绩效的替代模型。结果表明,建筑面积和建筑物中楼层的数量是项目时间表现的关键决定因素。此外,结果表明,成本不能很好地预测时间性能。还介绍了研究的局限性和实际意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号