首页> 外文期刊>Water Resources Management >The Influence of the Construction Technology in Time-Cost Relationships of Sewerage Projects
【24h】

The Influence of the Construction Technology in Time-Cost Relationships of Sewerage Projects

机译:施工技术对排污工程工时关系的影响

获取原文
获取原文并翻译 | 示例
           

摘要

Time-cost models have been developed in various contexts to assist in forecasting the duration of different types of projects. The present research explores the influence of the construction technology on the time-cost relationship. For that purpose, the data from 21 sewerage projects using trenchless technology and from 49 sewerage projects using the traditional open-cut method was analyzed. The 70 sewerage projects analyzed were completed in Chicago, U.S., between 1994 and 2002. The influence of the construction technology in the time-cost relationship was found to be statistically significant and time-relationships were determined for sewerage projects using trenchless technology and the traditional open-cut method. Furthermore, along with the Bromilow type models an alternative approach was tested using the time normalized by the project cost as dependent variable, allowing additional insight into the time performance of the open-cut and lining technology used (cured in place).
机译:已在各种情况下开发了时间成本模型,以帮助预测不同类型项目的持续时间。本研究探讨了施工技术对时间-成本关系的影响。为此,分析了使用非开挖技术的21个污水处理项目和使用传统明挖法的49个污水处理项目的数据。分析的70个污水处理项目在1994年至2002年之间在美国芝加哥完成。发现施工技术对时间成本关系的影响具有统计学意义,并且使用无挖沟技术和传统方法确定了污水处理项目的时间关系。开路方法。此外,与Bromilow型模型一起使用以项目成本归一化的时间作为因变量来测试了一种替代方法,从而可以进一步了解所使用的开挖和衬砌技术(已固化)的时间性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号