Integrated Framework for Quantifying and Predicting Weather-Related Highway Construction Delays

机译:量化和预测与天气相关的公路建设延误的综合框架

获取原文
获取原文并翻译 | 示例
           

摘要

Constant exposure to the environment makes highway construction highly dependent on weather. However, highway construction contracts are often unclear about the potential influence of weather-related delays on highway construction project schedules. There is a need to discourage litigation arising from weather-related delays by including in contracts a reasonable number of nonwork days as a consequence of adverse weather and providing an equitable criteria for the course of action when the predictions in the contracts turn out to be inaccurate. To address this need, an integrated framework consisting of the following two key components is proposed: (1) identification of attributes of weather that cause construction delays and (2) generation of synthetic weather sequences using a stochastic weather generator to quantify and provide probabilistic forecasts of weather threshold values. The utility of this framework is demonstrated through its application to construction work on a project in Texas. The use of probabilistic forecast of construction delay attributes provided by a semiparametric weather generator in this research is an example of interdisciplinary study to help address this problem. The result of the research is better decision support for agencies who wish to author contracts that more equitably allow for the influence of weather during construction.
机译:持续暴露在环境中使高速公路建设高度依赖天气。但是,公路建设合同通常不清楚与天气有关的延误对公路建设项目进度的潜在影响。有必要通过在合同中加入合理的非工作天数(由于不利天气而导致的天气相关延误)来阻止诉讼,并且当合同中的预测结果不准确时为诉讼提供公平的标准。为了满足这一需求,提出了一个由以下两个关键组成部分组成的综合框架:(1)识别导致施工延误的天气属性;(2)使用随机天气生成器来量化和提供概率预报来生成合成天气序列天气阈值。通过将该框架应用于德克萨斯州一个项目的施工工作,证明了该框架的实用性。在这项研究中使用由半参数天气生成器提供的施工延迟属性的概率预测是跨学科研究的一个示例,可以帮助解决此问题。研究的结果是为希望签定更公平地考虑到施工期间天气影响的合同的代理商提供更好的决策支持。

著录项

  • 来源
    《Journal of Construction Engineering and Management》 |2010年第11期|p.1160-1168|共9页
  • 作者单位

    Office of Research and Development, Dept. of Royal Irrigation, Nonthaburi 11120, Thailand;

    Dept. of Civil, Environmental, and Architectural Engineering, Univ. of Colorado, 428 UCB, Boulder, CO 80309-0428;

    Dept. of Civil, Environmental, and Architectural Engineering, Univ. of Colorado, 428 UCB, Boulder, CO 80309-0428;

    Dept. of Civil, Environmental, and Architectural Engineering and Cooperative Institute for Research in Environmental Sciences (CIRES), Univ. of Colorado, 428 UCB, Boulder, CO 80309-0428;

    Dept. of Civil, Environmental, and Architectural Engineering, Univ. of Colorado, 428 UCB, Boulder, CO 80309-0428;

    Dept. of Civil, Environmental, and Architectural Engineering, Univ. of Colorado, 428 UCB, Boulder, CO 80309-0428;

    Dept. of Construction Management, Minnesota State Univ., 354 Wiecking Center, Mankato, MN 56001;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    weather; delay time; highway and road construction; scheduling; contracts; critical path method;

    机译:天气;延迟时间;公路和公路建设;排程合同;关键路径法;