首页> 外文学位 >A model to predict the impact of excusable and non-excusable delays on selected residential construction projects.
【24h】

A model to predict the impact of excusable and non-excusable delays on selected residential construction projects.

机译:预测可原谅和不可原谅的延迟对选定住宅建设项目的影响的模型。

获取原文
获取原文并翻译 | 示例

摘要

Construction duration is a crucial element in any contract between the client and the contractor or between the contractor and sub-contractor. Unfortunately delays, which are common on construction projects, are also one of the most costly problems. This means that the minimum cost and acceptable performance for projects is affected if the construction time period is extended. In other words, time is money, and a delay on a project means loss of profit for contractor or additional cost to the owner. In this study, a model is proposed that could be used to predict the impact of delays on high-end residential construction projects.
机译:在客户与承包商之间或承包商与分包商之间的任何合同中,工期是至关重要的因素。不幸的是,在建筑项目中常见的延误也是最昂贵的问题之一。这意味着,如果延长施工时间,则会影响项目的最低成本和可接受的性能。换句话说,时间就是金钱,项目的延误意味着承包商的利润损失或所有者的额外成本。在这项研究中,提出了一个模型,该模型可用于预测延迟对高端住宅建设项目的影响。

著录项

  • 作者

    Farzam Behboudi, Shervin.;

  • 作者单位

    Carleton University (Canada).;

  • 授予单位 Carleton University (Canada).;
  • 学科 Engineering Civil.
  • 学位 M.A.Sc.
  • 年度 2009
  • 页码 173 p.
  • 总页数 173
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号