...
首页> 外文期刊>Journal of Construction Engineering and Management >Challenges of Process Modeling in Architecture and Engineering to Execute Projects and Public Works
【24h】

Challenges of Process Modeling in Architecture and Engineering to Execute Projects and Public Works

机译:建筑和工程过程建模对执行项目和公共工程的挑战

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The purpose of this paper is to present a structure of governance for activities and processes applicable to the architecture and engineering sector for the execution of projects and public works. It is intended that this structure will orchestrate the various necessary actions, ranging from the identification of the complete organization's delivery scope, through to delivery disorders, activity structure, and the way in which these activities are to be managed. The current literature does not include a complete structure applicable to public service that can be widely used and with short learning time, such as the presented structure. Based on a business process management (BPM) cycle, the stages of planning, analysis, modeling, and optimization of processes were developed. In the planning phase, the typical activities of a sector responsible for the architecture and engineering projects and works of a public institution were identified and categorized, and possible dysfunctions were verified. Subsequently, analysis and modeling of the prioritized processes was performed, and finally, optimization and validation of the modeled processes were completed. The results obtained demonstrated that the proposal can be applied to seek improvements in public organizational environments regarding issues related to architecture and engineering projects and works through the management of their processes. Moreover, the lessons learned have indicated some common problems of the administrative units responsible for this type of activity that need to be addressed.
机译:本文的目的是提出适用于建筑和工程部门执行项目和公共工程的活动和过程的治理结构。该结构旨在协调各种必要的操作,从确定整个组织的交付范围到交付混乱,活动结构以及这些活动的管理方式。当前的文献没有包括可广泛使用且学习时间短的适用于公共服务的完整结构,例如所提出的结构。基于业务流程管理(BPM)周期,开发了计划,分析,建模和流程优化的阶段。在计划阶段,对负责建筑和工程项目以及公共机构工作的部门的典型活动进行了识别和分类,并验证了可能的功能失调。随后,对优先处理的流程进行了分析和建模,最后完成了对建模流程的优化和验证。获得的结果表明,该提案可用于寻求公共组织环境中与建筑和工程项目有关的问题的改进,并且可以通过对过程的管理来进行工作。此外,所汲取的教训表明,负责这类活动的行政部门有一些共同的问题需要解决。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号