...
首页> 外文期刊>Journal of computational science >Experience of using FEM for real-time flood early warning systems: Monitoring and modeling Boston levee instability
【24h】

Experience of using FEM for real-time flood early warning systems: Monitoring and modeling Boston levee instability

机译:使用FEM进行实时洪水预警系统的经验:监测和建模波士顿大堤的不稳定性

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Boston levee has a documented history of slope slippages under tidal fluctuations reaching 6-m range on spring tides. A finite element model of the Boston levee has been developed in the off-line mode; after that, it was integrated into the common information space of the UrbanFlood early warning system and connected to live sensor data stream registering tidal fluctuations of river level and corresponding response of pore pressures and media temperatures. Stability analysis was carried in a real-time mode.
机译:波士顿大堤有记录的春潮潮汐波动在6米范围内的滑坡历史。离线模式已开发了波士顿大堤的有限元模型。之后,它被集成到UrbanFlood预警系统的公共信息空间中,并连接到实时传感器数据流,该数据流记录了河流水位的潮汐波动以及相应的孔隙压力和介质温度的响应。稳定性分析是在实时模式下进行的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号