首页> 外文期刊>Journal of Cleaner Production >Fuzzy modelling of the critical failure factors for modular integrated construction projects
【24h】

Fuzzy modelling of the critical failure factors for modular integrated construction projects

机译:模块化综合建设项目临界故障因素的模糊建模

获取原文
获取原文并翻译 | 示例
       

摘要

Modular integrated construction (MiC) is a game-changing cleaner construction approach which improves construction project performances. For many types of buildings, MiC is increasingly becoming a preferred construction method. However, MiC projects have generated mixed outcomes; many of them encountered problems and even failed. Yet, there is limited knowledge of the reasons why MiC projects may fail. This research identified and evaluated 22 potential critical failure factors (CFFs) for MiC projects, based on a structured questionnaire survey with international experts. A mean score analysis showed that all the identified CFFs are significant factors causing MiC project failure. A structure detection analysis of the CFFs generated a 4-factor solution explaining about 72.34% of the total variance in the failure of MiC projects. The 4 principal failure factors (PFFs) for MiC projects comprise poor design and dimensional variability management, poor stakeholder and supply chain management, limited technical knowledge, capability and experience, and late commitment. A fuzzy modelling of the CFFs revealed that all the 4 PFFs are significant factors causing MiC project failure. The inclusive findings of the research have useful implications. Theoretically, the findings contribute to the useful checklist of generic CFFs for MiC projects. Practically, the research prioritized the CFFs, which may serve as a useful management-support in the implementation of MiC projects. (C) 2020 Elsevier Ltd. All rights reserved.
机译:模块化集成结构(MIC)是一种更改的清洁施工方法,可提高建设项目表演。对于许多类型的建筑物,MIC越来越成为优选的施工方法。但是,MIC项目产生了混合结果;其中许多人遇到了问题,甚至失败了。然而,了解MIC项目可能失败的原因有限。本研究根据与国际专家的结构化问卷调查,确定了MIC项目的22个潜在的关键故障因素(CFF)。平均得分分析表明,所有已识别的CFF都是导致MIC项目故障的重要因素。 CFFS的结构检测分析产生了4因素解决方案,解释了MIC项目失败的总方差约72.34%。 MIC项目的4个主要故障因素(PFFS)包括差的设计和维度可变性管理,利益相关者差,供应链管理,有限的技术知识,能力和经验,以及晚期承诺。 CFF的模糊建模显示,所有4个PFF都是导致MIC项目失败的重要因素。该研究的包容性结果具有有用的影响。从理论上讲,调查结果有助于MIC项目的通用CFFS的有用清单。实际上,研究优先考虑了CFFS,这可以作为实施MIC项目的有用管理支持。 (c)2020 elestvier有限公司保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号