首页> 外文会议>International Conference on Construction and Real Estate Management >Evaluating the Critical Failure Factors for Implementing Residential Modular Integrated Construction Projects
【24h】

Evaluating the Critical Failure Factors for Implementing Residential Modular Integrated Construction Projects

机译:评估实施住宅模块综合建设项目的关键故障因素

获取原文

摘要

Residential modular integrated construction (RMiC) offers the benefits of speed, economy quality, and mass production in housing delivery. Evidence in some countries have established the feasibility of using RMiC to address the housing shortfalls, but not all initiated RMiC projects have achieved the desired level of success. However, there is limited knowledge of the shared factors contributing to the failure of RMiC projects. This research identified and prioritized the critical failure factors (CFFs) for RMiC projects. Analysis of international survey-based data showed that the top 4 CFFs for RMiC projects include inaccurate engineering specifications and late design freeze; limited fabricator experience and capabilities in modules design and production; poor working collaboration and infrequent communication among project participants; and supply chain disruptions and disturbances. This research constitutes the first exclusive quantitative evaluation and prioritization of the CFFs for RMiC projects and makes a useful contribution to the knowledge of RMiC project management. It may provide decision support to practitioners and form a useful basis for future research.
机译:住宅模块化综合施工(RMIC)提供了速度,经济质量和大规模生产住房交付的好处。一些国家的证据已经建立了利用RMIC解决住房短缺的可行性,但并非所有发起的RMIC项目都取得了预期的成功水平。但是,有限了解有助于RMIC项目失败的共享因素。该研究确定并优先考虑RMIC项目的关键故障因子(CFF)。基于国际调查的数据分析表明,RMIC项目的前4名CFFS包括不准确的工程规格和晚期设计冻结;有限的制造商体验和模块设计和生产的能力;项目参与者之间的工作合作和不常见的沟通;和供应链中断和干扰。本研究构成了对RMIC项目的第一个独家定量评估和优先级,对RMIC项目管理的知识进行了有用的贡献。它可能为从业者提供决策支持,并为未来的研究形成一个有用的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号