Analyzing green building project risk interdependencies using Interpretive Structural Modeling

机译:用解释性结构建模分析绿色建筑项目风险相互依赖性

获取原文
获取原文并翻译 | 示例
       

摘要

Green building (GB) projects have attracted wide attention in the construction industry in recent years owing to numerous benefits of green practices for sustainable development. However, existing research efforts on GB project risk management are very limited, and no prior in-depth research has focused on studying the risk interdependencies in GB projects from the perspectives of both the project life cycle and multiple project risks. This paper begins by identifying and distinguishing GB project constraints from multiple GB project risks using a systematic literature review and then investigates, based on the Interpretive Structural Modeling (ISM) method, the risk interdependencies taking into account the identified 16 constraint factors, 22 risk factors and 11 objectives throughout a GB project life cycle. The importance of constraints and risk factors associated with GB project objectives was calculated based on the influence transmission through network paths in the established ISM-based model. In addition, the Matrice d'Impacts Croises Multiplication Appliquee a un Classement (MICMAC) approach was used to analyze the drive and dependence powers of risk interdependency elements. Critical constraints and risk factors in the implementation of GB projects can be obtained from the proposed risk analysis model, which contributes to an in-depth risk perception of GB projects for industry practitioners and facilitates GB project risk management in a more effective way. (c) 2020 Elsevier Ltd. All rights reserved.
机译:近年来,由于可持续发展的绿色实践的许多好处,绿色建筑(GB)项目引起了近年来的广泛关注。但是,GB项目风险管理的现有研究努力非常有限,并且没有先前的深入研究,从项目生命周期和多个项目风险的角度来看,没有进一步的深入研究。本文通过使用系统文献综述来识别和区分GB项目限制从多个GB项目风险,然后根据解释性结构建模(ISM)方法,考虑到所确定的16个约束因素,22个风险因素和11个目标在整个GB项目生命周期中。基于基于ISM的模型中的网络路径的影响传输来计算与GB项目目标相关的限制和风险因素的重要性。此外,基质D'撞击性乘法倍增宴会A联合国的等级(MicMac)方法用于分析风险相互依赖元素的驱动和依赖权。在拟议的风险分析模型中可以获得实施GB项目中的临界约束和风险因素,这有助于为行业从业者的GB项目进行深入的风险感知,并以更有效的方式促进GB项目风险管理。 (c)2020 elestvier有限公司保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号