首页> 外文期刊>Journal of bridge engineering >Shear Lag Effect in Simply Supported Prestressed Concrete Box Girder
【24h】

Shear Lag Effect in Simply Supported Prestressed Concrete Box Girder

机译:简支预应力混凝土箱梁的剪力滞效应

获取原文
获取原文并翻译 | 示例
       

摘要

In this paper, derivation and computed formulas are provided for the shear lag coefficient in a simply supported prestressed concrete box girder under dead load. In the case of prestressed tendons having parabolic configurations, formulas to compute the shear lag effect are also developed. The magnitude of upward loading intensity caused by prestress as well as the relationship between the height of the box girder and the sag of prestressed tendons have been fully treated. Conclusions are drawn that the shear lag effect caused by dead load and prestress force is equivalent to dead load acting alone, provided that the prestressed tendon is set up with a parabolic profile Shear lag effect caused by movable load is also analyzed according to the eccentricity of the load to the half-width ratio of the box girder. Charts were prepared 19 predict the shear lag coefficient for live load. Finally, having considered the shear deformation of flanges, the deflection of box girders is studied for both uniformly distributed load and concentrated load. Examples are given for illustrative purpose
机译:本文为简支预应力混凝土箱梁在恒载作用下的剪力滞后系数提供了推导和计算公式。在预应力筋为抛物线形的情况下,还开发了计算剪力滞后效应的公式。预应力引起的向上荷载强度的大小以及箱形梁的高度与预应力筋垂度之间的关系已得到充分处理。得出的结论是,假设静应力和抛物线轮廓共同作用,则由静载荷和预应力引起的剪力滞后效应等效于单独作用的静载荷。荷载与箱形梁的半角比。准备图表19预测活荷载的剪切滞后系数。最后,考虑了法兰的剪切变形,研究了箱形梁在均匀分布荷载和集中荷载作用下的挠度。给出示例是为了说明目的

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号