首页> 外文期刊>Mathematical Problems in Engineering >Effect of Construction Method on Shear Lag in Prestressed Concrete Box Girders
【24h】

Effect of Construction Method on Shear Lag in Prestressed Concrete Box Girders

机译:施工方法对预应力混凝土箱梁剪力滞的影响

获取原文
获取原文并翻译 | 示例
           

摘要

Most of the previous researches conducted on shear lag of box girders were only concerned about simple types of structures, such as simply supported and cantilever beams. The structural systems concerned in these previous researches were considered as determined and unchangeable. In this paper, a finite element method considering shear lag and creep of concrete was presented to analyze the effect of dynamic construction process on shear lag in different types of concrete box-girder bridges. The shear lag effect of the three types of a two-span continuous concrete beam classified by construction methods was analyzed in detail according to construction process. Also, a three-span prestressed concrete box-girder bridge was analyzed according to the actual construction process. The shear lag coefficients and stresses on cross sections along the beam including shear lag were obtained. The different construction methods, the changes of structural system with the construction process, the changes of loading and boundary conditions with the construction process and time, the prestressing, and creep were all imitated in the calculations. From comparisons between the results for beams using different construction methods, useful conclusions were made.
机译:以前对箱梁的剪力滞进行的大多数研究仅关注简单类型的结构,例如简支梁和悬臂梁。这些先前研究中涉及的结构系统被认为是确定的且不变的。本文提出了一种考虑剪力滞和混凝土蠕变的有限元方法,以分析动态施工过程对不同类型混凝土箱梁桥的剪力滞的影响。根据施工过程,详细分析了三种按施工方法分类的两跨连续混凝土梁的剪力滞效应。另外,根据实际施工过程,对三跨预应力混凝土箱梁桥进行了分析。获得了剪切滞后系数和包括剪切滞后在内的沿梁截面的应力。计算中模拟了不同的施工方法,结构体系随施工过程的变化,荷载和边界条件随施工过程和时间的变化,预应力和蠕变。通过比较使用不同构造方法的梁的结果,得出了有用的结论。

著录项

  • 来源
    《Mathematical Problems in Engineering》 |2012年第9期|273295.1-273295.17|共17页
  • 作者

    Shi-Jun Zhou;

  • 作者单位

    School of Civil Engineering, Chongqing University, 174 Shazheng Road, Chongqing 400030, China,Key Laboratory of New Technology for Construction of Cities in Mountain Area, Ministry of Education, Chongqing University, Chongqing 400030, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号