...
首页> 外文期刊>Navy international >After ANZAC: RAN nears decision on SEA 5000 Future Frigate design
【24h】

After ANZAC: RAN nears decision on SEA 5000 Future Frigate design

机译:在ANZAC之后:RAN即将决定SEA 5000 Future Frigate设计

获取原文
获取原文并翻译 | 示例

摘要

The design selected for the Royal Australian Navy's (RAN's) next generation of major surface combatants should be announced no later than April 2018 - possibly sooner, and construction of the first of nine future frigates is slated to begin two years later. Questions remain about the implementation of this tight schedule, given that the build phase was accelerated by three years in 2015 by then-prime minister Tony Abbott to save shipbuilding jobs in South Australia. Nevertheless, the intent of the AUD35billion (USD25.5 billion) SEA 5000 programme is clear: to produce nine Australian-built anti-submarine warfare (ASW) frigates with additional capabilities ranging from constabulary operations to task group-orientated warfighting.
机译:为澳大利亚皇家海军下一代主要水面战斗机选择的设计应该不迟于2018年4月宣布-可能会更早宣布,未来九艘护卫舰中的第一艘的建造计划于两年后开始。鉴于时任总理托尼·阿伯特(Tony Abbott)于2015年将建造阶段缩短了三年,以节省南澳大利亚的造船工作,因此对于执行这一紧迫时间表的问题仍然存在。尽管如此,总值350亿澳元(约合255亿美元)的SEA 5000计划的意图很明确:生产9架澳大利亚制造的反潜战护卫舰,其附加功能从警务行动到以任务小组为导向的战斗都有。

著录项

  • 来源
    《Navy international 》 |2017年第7期| 22-28| 共7页
  • 作者

    Julian Kerr;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号