首页> 外文期刊>Jane's international defense review >USN readies for Triton Milestone C by year end
【24h】

USN readies for Triton Milestone C by year end

机译:USN年底前准备使用Triton Milestone C

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The US Navy (USN) is expected by mid-April to conduct the first flight of an MQ-4C Triton unmanned aircraft system (UAS) equipped with a sensor suite including the AN/ZPY-3 Multi-Function Active Sensor and the Automatic Identification System (AIS) used to identify commercial ships. The flights will take place at Naval Air Station Patuxent River, Maryland, where all three of the navy's Triton UAS have been outfitted with the sensor package. The flights were to have occurred the week of 6 April; however, they were delayed due to poor weather conditions, a USN Naval Air Systems Command spokesperson told IHS Jane's.
机译:预计美国海军(USN)将于4月中旬进行MQ-4C Triton无人机系统(UAS)的首次飞行,该系统配备传感器套件,包括AN / ZPY-3多功能有源传感器和自动识别功能用于识别商业船舶的系统(AIS)。这些飞行将在马里兰州Patuxent River海军航空站进行,那里所有三个海军的Triton UAS都装有传感器套件。该航班原定于4月6日这一周发生;美国海军海军航空系统司令部发言人告诉IHS Jane's,但是由于天气恶劣,飞机被推迟了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号