首页> 外文期刊>Jane's Defence Weekly >JLTVs too slow in ship-to-shore tests
【24h】

JLTVs too slow in ship-to-shore tests

机译:JLTV在船到岸测试中太慢

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Pentagon testers have found that Joint Light Tactical Vehicle (JLTV) prototypes are slow to deploy from ship to shore, so would leave US Marine Corps (USMC) units "vulnerable to threats". The Director of Operational Test and Evaluation (DOT&E) annual report, released on 20 January, said in developmental test/operational test (DT/OT) events USMC units with JLTVs were hampered by the new trucks' lack of deployability.
机译:五角大楼的测试人员发现,“联合轻型战术车”(JLTV)原型机从船到岸的部署速度很慢,因此会使美国海军陆战队(USMC)的部队“容易受到威胁”。 1月20日发布的运营测试与评估总监(DOT&E)年度报告称,在开发测试/运营测试(DT / OT)事件中,配备JLTV的USMC单位因新卡车缺乏可部署性而受阻。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号