...
首页> 外文期刊>Jane's airport review >New terminal brings change to Christchurch
【24h】

New terminal brings change to Christchurch

机译:新航站楼为基督城带来了变化

获取原文
获取原文并翻译 | 示例
           

摘要

Christchurch International Airport in New Zealand is eyeing rapid growth after a new integrated terminal opened on 18 April 2013. The NZD237 million (USD 199 million) terminal was completed in March, on time and within budget. It stands on the site of the old domestic terminal, which was demol- ished, and is integrated with the old international terminal. "It has domestic and international check-in areas, a large retail and F&B [food and beverage] precinct, large departure and arrival lounges, and swing gates - all with a South Island look and feel," said Matthew Findlay, general manager for aeronautical business development.
机译:新西兰基督城国际机场于2013年4月18日启用新的综合航站楼后,其增长迅速。2.37亿新西兰元(1.99亿美元)的航站楼已于3月按时,在预算内完工。它位于旧的国内航站楼旧址上,该航站楼已拆除,并与旧的国际航站楼整合在一起。 “它有国内和国际登机手续区,大型零售和F&B(食品和饮料)区,大型出发和到达休息室以及平开门-都具有南岛的外观,”该公司总经理Matthew Findlay说道。航空业务发展。

著录项

  • 来源
    《Jane's airport review》 |2013年第5期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号