...
【24h】

Hydor Tasmanian projects

机译:Hydor塔斯马尼亚项目

获取原文
获取原文并翻译 | 示例
           

摘要

Gordon - Hydroelectric power station on the Gordon River in southwest Tasmania. Its powerhouse is located underground with water supplied from Lake Gordon through a vertical shaft and returned to the Gordon through a 1.6km tailrace tunnel. Commissioned in 1977 with two machines (and a third commissioned in 1988), it has an operating head of 192m and a total of 450MW installed capacity. Gordon is a storage station; the first two machines provide base load generation while the third machine provides peak generation. The storage dam is a spectacular double curvature concrete arch with a height of 140m and crest length of 198m.
机译:戈登-塔斯马尼亚西南部戈登河上的水力发电站。它的发电站位于地下,水由戈登湖通过垂直竖井供应,然后通过1.6公里的尾水隧道返回戈登。该设备于1977年投入使用,有两台机器(第三台于1988年投入运行),运行扬程192m,总装机容量为450MW。戈登是一个存储站;前两个机器提供基本负载生成,而第三个机器提供峰值负载。蓄水坝是一座壮观的双曲混凝土拱门,高140m,冠长198m。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号