首页> 外文期刊>International railway journal >Olten - Aarau four-tracking underway
【24h】

Olten - Aarau four-tracking underway

机译:奥尔滕-阿劳正在进行四轮追踪

获取原文
获取原文并翻译 | 示例
           

摘要

Swiss federal transport minister Mrs Doris Leuthard and members of the executive board of Swiss Federal Railways (SBB) officially launched major construction on May 2 on an €823m project to expand the 13km Olten - Aarau line from two to four tracks. The centerpiece of the project is the 3km Eppenberg Tunnel near the village of Woeschnau, which is due to be completed at the end of 2020, enabling the operation of half-hourly regional services between Olten and Aarau as well as a 15-minute interval Bern - Zuerich inter-city service. SBB launched preliminary works around Woeschnau and Gretzenbach last September.
机译:瑞士联邦运输部长多里斯·洛伊特哈德夫人和瑞士联邦铁路局(SBB)执行委员会成员于5月2日正式启动了一项重大建设项目,耗资8.23亿欧元,将13公里长的奥尔滕-阿劳铁路线从两条轨道扩展到四个轨道。该项目的核心是位于Woeschnau村附近的3公里的Eppenberg隧道,该隧道将于2020年底完工,使奥尔滕和阿劳之间的半小时区域服务运营以及间隔15分钟的伯尔尼-苏黎世城际服务。 SBB于去年9月在Woeschnau和Gretzenbach周围开展了初步工作。

著录项

  • 来源
    《International railway journal》 |2015年第6期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号