首页> 外文期刊>International journal of water resources development >Assessing the Assessments: Case Study of an Emergency Action Plan for the Control of Water Hyacinth in Lake Victoria
【24h】

Assessing the Assessments: Case Study of an Emergency Action Plan for the Control of Water Hyacinth in Lake Victoria

机译:评估评估:维多利亚湖水葫芦紧急控制计划的案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

This study evaluates the impact assessment methodologies used by Uganda's Water Hyacinth Control Programme in Lake Victoria, a domestic project with transboundary implications. The Control Programme sought to reduce infestations of water hyacinth (Eichhornia crassipes), an aquatic weed native to South America, through the use of integrated chemical, mechanical and biological methods. The environmental impact assessment for the project was conducted by Aquatics Unlimited, with support from the United States Agency for International Development. Although the case study involves a domestic impact assessment, it raised transboundary concerns. One of the major outcomes of the assessment was recognition of the need for informed involvement of the other riparian countries, Kenya and Tanzania, in the assessment process to ensure a regional effort among all three East African Community Partner States to control water hyacinth and other invasive weeds in Lake Victoria.
机译:这项研究评估了乌干达维多利亚州水葫芦控制计划所使用的影响评估方法,该计划是一项涉及跨界影响的国内项目。该控制计划力求通过使用综合的化学,机械和生物方法来减少水葫芦(凤眼凤梨)(一种南美原生水生杂草)的侵染。在美国国际开发署的支持下,水上运动无限公司对该项目进行了环境影响评估。尽管案例研究涉及国内影响评估,但引起了跨界关注。评估的主要成果之一是认识到有必要让其他沿河国家,肯尼亚和坦桑尼亚充分参与评估过程,以确保东非三个共同体伙伴国在区域内努力控制水葫芦和其他侵入性维多利亚湖中的杂草。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号