...
首页> 外文期刊>International journal of river basin management >Effects of information cascades on collaborative decision-making in river engineering projects on the Rio Grande
【24h】

Effects of information cascades on collaborative decision-making in river engineering projects on the Rio Grande

机译:信息层叠对里奥格兰德河工程项目中协作决策的影响

获取原文
获取原文并翻译 | 示例
           

摘要

Conventional wisdom is that early involvement of stakeholders leads to better results in engineering decision-making processes. A commonly documented advantage of early stakeholder involvement is increased acceptance and ownership of the project by everyone involved, resulting in fewer disputes throughout the planning and decision-making process. However, information cascade theory suggests that early involvement and development of close working relationships among stakeholders may decrease a group's ability to objectively and effectively evaluate engineering alternatives, as group members substitute the consensus of the group for their personal judgements. Additionally, innovation in design may be inversely correlated with the extent of group interaction prior to the selection of a preferred alternative. Experience in river engineering projects of the US Bureau of Reclamation on the Rio Grande in New Mexico supports the idea that early stakeholder involvement, while effective in reducing disputes, has a suppressive effect on design innovation.
机译:传统观点认为,利益相关者的早期参与可以在工程决策过程中带来更好的结果。早有利益相关者参与的一个有据可查的优势是,参与的每个人对项目的接受程度和所有权都得到了提高,从而在整个计划和决策过程中减少了争议。但是,信息级联理论表明,利益相关者之间的早期参与和密切关系的发展可能会降低小组客观有效地评估工程备选方案的能力,因为小组成员用小组的共识代替了他们的个人判断。另外,在选择优选替代方案之前,设计创新可以与群体互动的程度成反比。美国在新墨西哥州里奥格兰德的垦殖局的河流工程项目中的经验支持这样一种观点,即利益相关者的早期参与虽然可以有效减少纠纷,但对设计创新具有抑制作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号