Age Replacement Policies with Shortage and Excess Costs

机译:短缺和费用过多的年龄替换政策

获取原文
获取原文并翻译 | 示例
           

摘要

It has been proposed in recent literatures that if replacement time is planned too early prior to failure time, a waste of operation cost, i.e., excess costs, would incur because the system might run for an additional period of time to complete critical operations; and if the replacement time is too late after failure, a great failure cost, i.e., shortage cost, is incurred due to the delay in time of the carelessly scheduled replacement. The above notion of shortage and excess costs are taken into consideration for the replacement first, replacement last and replacement overtime models in this paper. We obtain the expected cost rates and their optimum replacement times. Comparisons among these optimum times are made analytically and numerically.
机译:在最近的文献中已经提出,如果在故障时间之前计划更换时间太早,则会浪费操作成本,即过高的成本,因为系统可能要再运行一段时间才能完成关键的操作。如果故障后的更换时间太晚,则由于不小心安排的更换时间的延迟而导致很大的故障成本,即短缺成本。在本文的首次更换,最后更换和加班超时模型中均考虑了上述短缺和超额成本的概念。我们获得了预期的成本率及其最佳更换时间。这些最佳时间之间的比较是通过分析和数字方式进行的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号