首页> 外文期刊>International Journal of Project Management >Psychosocial aspects of project work: a comparison between product development and construction projects
【24h】

Psychosocial aspects of project work: a comparison between product development and construction projects

机译:项目工作的社会心理方面:产品开发与建设项目之间的比较

获取原文
获取原文并翻译 | 示例
       

摘要

Different project goals provide different prerequisites for project work and team processes. Two important aspects of project goals are technological certainty/uncertainty and adequacy of goal definition. Product development projects and construction projects are different in these respects. The study explores differences between the two types of projects with regard to psychosocial aspects of the work situation. Data were collected by means of a questionnaire study (n = 98). The items in the questionnaire were designed to investigate social processes, individual work environment, and input/output factors. Results indicate that there were more developed team processes in the product development projects, and that co-workers on such projects experienced development of professional skills to a greater extent. In general, social processes requiring conceptual co-operation and communication were less pronounced in the construction projects investigated. The paper discusses how the differences found between the two kinds of projects can be related to work settings. Possible implications for future research are considered.
机译:不同的项目目标为项目工作和团队流程提供了不同的前提条件。项目目标的两个重要方面是技术确定性/不确定性和目标定义的充分性。产品开发项目和建设项目在这些方面有所不同。该研究探讨了两种类型的项目在工作状况的社会心理方面的差异。通过问卷调查收集数据(n = 98)。问卷中的项目旨在调查社会过程,个人工作环境以及投入/产出因素。结果表明,产品开发项目中的团队流程更加发达,并且此类项目的同事在很大程度上发展了专业技能。一般而言,在所调查的建设项目中,需要概念性合作和沟通的社会过程不太明显。本文讨论了两种项目之间发现的差异如何与工作设置相关。考虑了对未来研究的可能影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号