A new approach for project scheduling using fuzzy dependency structure matrix

机译:基于模糊依赖结构矩阵的项目调度新方法

获取原文
获取原文并翻译 | 示例
       

摘要

As an alternative solution, the Dependency Structure Matrix (DSM) is a useful tool in project scheduling when approaching information dependency issues between activities. However, the current DSM approach faces the dilemma that the overlap of activities cannot be precisely estimated in the planning stage of a project, and the solution calls for a robust methodology for managing schedules within uncertain conditions of information dependency. The aim of our research is to propose an approach that utilizes fuzzy set theory to solve the problem within an uncertain environment. As an extension of traditional DSM-based scheduling, we describe the overlap and duration of activities as fuzzy numbers and put forth a systematic algorithm to calculate the time variables of activities and project duration thereof. An example is also provided to demonstrate the effectiveness of the algorithm.
机译:作为替代解决方案,当处理活动之间的信息依赖性问题时,依赖性结构矩阵(DSM)是项目调度中的有用工具。但是,当前的DSM方法面临一个难题,即在项目的规划阶段无法准确估计活动的重叠,因此该解决方案需要一种可靠的方法来在不确定的信息依赖条件下管理进度。我们研究的目的是提出一种利用模糊集理论来解决不确定环境中问题的方法。作为传统基于DSM的调度的扩展,我们将活动的重叠和持续时间描述为模糊数,并提出了系统的算法来计算活动的时间变量及其项目持续时间。还提供了一个示例来演示该算法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号