Project cash flow analysis in the presence of uncertainty in activity duration and cost

机译:在活动持续时间和成本不确定的情况下进行项目现金流量分析

获取原文
获取原文并翻译 | 示例
       

摘要

The inherent uncertainty and imprecision in project scheduling have motivated the proposal of several fuzzy set theory based extensions of activity network scheduling techniques. Building upon these, a cash flow calculation methodology for projects including activities with fuzzy durations and/or costs is proposed in this paper. According to the proposed approach, the project cash flow is represented by an S-surface (as opposed to the traditional S-curve) ensuing by connecting S-curves at different risk possibility levels. The methodology is exemplified by estimating the working capital requirements in a real world road construction project. Furthermore, the benefits of the methodology and its subsequent computerization are discussed. It is believed that the proposed approach may also be useful for both evaluating project proposals during feasibility studies and for performing earned value analysis for project monitoring and control.
机译:项目调度中固有的不确定性和不精确性促使提出了几种基于模糊集理论的活动网络调度技术扩展方案。在此基础上,本文提出了针对项目的现金流量计算方法,该方法包括持续时间和/或成本模糊的活动。根据所提出的方法,通过将不同风险可能性水平的S曲线连接起来,产生的S面(而不是传统的S曲线)表示项目现金流量。通过估算实际道路建设项目中的营运资金需求来举例说明该方法。此外,还讨论了该方法及其后续计算机化的好处。据信,所提出的方法对于在可行性研究期间评估项目建议以及执行用于项目监视和控制的挣值分析都可能是有用的。

著录项

  • 来源
    《International Journal of Project Management》 |2012年第3期|p.374-384|共11页
  • 作者单位

    Centre for Construction Innovation, National Technical University of Athens, Athens, Greece,Centre for Construction Innovation, Dept. of Construction Engineering and Management, Bldg. of Strength of Materials-Annex A, National Technical University of Athens, 9 Iroon Polytechneiou St., 15770, Athens, Greece;

    Centre for Construction Innovation, National Technical University of Athens, Athens, Greece;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    cash flow; fuzzy project scheduling; S-curve; S-surface;

    机译:现金周转;模糊项目调度;S形曲线S面;