METHOD FOR ANALYZING CASH FLOW OF REAL ESTATE DEVELOPMENT PROJECT WHICH PROVIDES ACTIVE ACTION TO FLOATING OF CASH FLOW-DETERMING FACTORS AND PROMPT, AUTOMATIC CALCULATION OF CASH FLOW WITHOUT ANY HAND-OPERATED MANUPULATION, AND PROJECT MANAGEMENT SYSTEM THEREOF

机译:提供浮动现金决定因素和提示的主动行动的房地产开发项目现金流量分析方法,无需任何手动操作的现金流量自动计算方法及其项目管理系统

摘要

The invention and actively respond to changes in building factor determining the cash flows of the real estate development business, passive operation One immediate escape, the present invention relates to a cash flow analysis and project management system for this purpose which provides automatic identification of cash flows. Cash flow analysis of the real estate development business in accordance with the present invention comprises a) and the factors that determine the cash flow, monthly withdrawal amount and priority, and inputting the data for the monthly cost, b) for the factors that determine the cash flow Monthly Cash Income for the month and monthly cash income amounts to automatically calculate the monthly cash income on the basis of the input data, aggregate, and the aggregate amount of monthly withdrawals first step of automatically calculating the monthly cost of construction aggregate, c) input from the month in the Monthly Cash Income First step of subtracting the current month receives a monthly amount withdrawn automatically calculate the monthly car 1 month resin and resin car 1 month cumulative, d) are automatically calculated by subtracting the current month to month cost amounts to 2 resin in the resin primary one month, based on this Automatic calculation of the cost, but the monthly payment amount and accumulated plastic car 2, when the value obtained by the following equation (1) equal to or greater than the sum of the cost amount of unpaid accumulated cost and the current month, and the month of construction aggregate outstanding amount of cost to all contractors Calculate the cost benefits to be paid automatically renewed on the basis of the amount paid to the contractor, and the month resin 1 month car should automatically enter the amount, minus the cost for the month resin 2 in the car as well as the balance of the current month, minus the amount paid to the contractor automatic input on total resin car 2, when the value obtained by the following equation (1) is less than the total cost of construction and the month cost accrued amount, the amount corresponding to the value obtained by the equation (1) said to be paid to the contractor, the contractor to In addition, the unpaid amount entered automatically in conjunction with auto-renewal on the basis of the cost benefits payments payable to the cost items, the amount of resin in the car one month minus the cost paid to the contractor and the month resin in addition to 2 Automatic Input Tray Steps to automatically enter the minimum required funding in the current month to 2 Cumulative resin, e) wherein a) to d) obtained by the step, month monthly income amount and monthly cash income and cash income into the county level based on the amount accumulated monthly withdrawals first month First priority withdrawal amount and monthly amount based on the current status and cumulative withdrawal amount, monthly payment and monthly construction cost month payments and payment status based on the cumulative cost, payable monthly cost month and the monthly cost and cost accounts payable accounts payable status based on cumulative monthly resins month . comprises the step of automatically calculating the monthly resins Car 2 Car 2 and cumulative status ; Formula 1 ; F (C) = SPI - PO - in the SNC ; Equation 1, F (C) a month cost payable amount, SPI resin MoM to 2 aggregate, PO is the month first withdrawal amount, SNC represents the minimum required capital.
机译:本发明并主动响应于确定房地产开发业务的现金流量的建筑因素的变化,被动操作一次逃生,本发明涉及为此目的的现金流量分析和项目管理系统,其提供现金流量的自动识别。 。根据本发明的房地产开发业务的现金流量分析包括:a)和确定现金流量,每月提款金额和优先级并输入每月成本数据的因素,b)确定价格的因素。现金流量本月的月现金收入和月现金收入金额,以输入数据,总计和每月提款总额为基础,自动计算每月现金收入。第一步,自动计算建筑的每月成本,c )从每月现金收入中的月份输入减去当前月份的第一步收到每月提取的金额,自动计算每月的树脂车1个月和树脂的树脂车1个月的累计量,d)通过减去当月的月成本自动计算根据此自动计算的费用,一个月树脂一次中的树脂费用为2分期付款金额和累积的塑料车2,当通过以下等式(1)获得的值等于或大于未支付的累计成本的成本金额与当月的总和,以及当月的工程累计未偿成本所有承包商应根据支付给承包商的金额来计算要自动续期的费用收益,并且每月树脂1个月的汽车应自动输入金额,减去该月份树脂2在汽车中的成本以及当月余额,减去支付给总树脂车2的承包商自动输入的金额,当通过以下等式(1)获得的值小于总建筑成本和当月成本应计金额时,该金额等于由等式(1)得出的应支付给承包商的价值,承包商还应根据c的规定自动将未付金额与自动续订一起输入成本项目应支付的ost利益付款,一个月的车内树脂量减去向承包商支付的费用以及向承包商每月支付的树脂费用以及2个自动输入托盘步骤,以自动输入当月的最低所需资金至2 e)累积树脂,其中a)至d)所获得的步骤,是根据每月提取的第一个月的第一个月优先提取的金额和每月的金额,根据每月提取的金额将每月的收入金额和每月的现金收入以及进入县级的现金收入当前状态和累计提款金额,每月付款和每月建设成本每月付款以及基于累计成本,应付每月成本月份和每月费用和应付费用账款的付款状态(基于累计每月树脂月)。包括自动计算每月的树脂汽车2和汽车2的累积状况的步骤; 公式1 ; SNC中的F(C)= SPI-PO-公式1中,F(C)为一个月的成本应付金额,SPI树脂的MoM为2的总和,PO为该月的第一个提款金额,SNC表示最低所需资本。

著录项

  • 公开/公告号KR20060009614A

    专利类型

  • 公开/公告日2006-02-01

    原文格式PDF

  • 申请/专利权人 WOOLIM C&C CO. LTD.;

    申请/专利号KR20040058271

  • 发明设计人 CHO DONG WOOK;

    申请日2004-07-26

  • 分类号G06Q99;

  • 国家 KR

  • 入库时间 2022-08-21 21:26:42