A comparative study of the measurements of perceived risk among contractors in China

机译:中国承包商感知风险度量的比较研究

获取原文
获取原文并翻译 | 示例
           

摘要

Due to the unique character of construction projects, perceived risk is widely used to quantify risks in the construction industry. This study investigates the two main types of measurement of perceived risk used in construction projects: direct measurement and expected utility-based measurement. Project managers from contract firms in China assess 15 independent risks using three different strategies: direct measurement, risk probability and potential impact. The last two are combined to create the expected utility-based measurement. The results show that the risk ranking order obtained from the direct measurement strategy is significantly different from that obtained from the expected utility-based measurement. Moreover, the former measurement is in general a better predictive indicator of relative managerial input than the latter. Based on these conclusions, some suggestions are presented for better risk management and cooperation in the construction industry.
机译:由于建筑项目的独特性,感知风险被广泛用于量化建筑行业的风险。这项研究调查了在建筑项目中使用的两种主要的感知风险衡量方法:直接衡量和基于预期效用的衡量。来自中国合同公司的项目经理使用三种不同的策略评估15种独立风险:直接测量,风险概率和潜在影响。最后两个结合起来以创建预期的基于效用的度量。结果表明,直接评估策略获得的风险等级顺序与预期的基于效用的评估获得的风险等级顺序显着不同。此外,前者的测量通常比后者更好地预测了相对管理投入。根据这些结论,提出了一些建议,以改善建筑行业的风险管理和合作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号