...
首页> 外文期刊>International Journal of Production Research >Order acceptance and scheduling policies for a make-to-order environment with family-dependent lead and batch setup times
【24h】

Order acceptance and scheduling policies for a make-to-order environment with family-dependent lead and batch setup times

机译:具有依赖于家庭的提前期和批次设置时间的按订单生产环境的订单接受和计划策略

获取原文
获取原文并翻译 | 示例

摘要

In many make-to-order production situations with batch setup times, customer orders are grouped into family-dependent batches to limit the loss of capacity due to setups. These batches, however, cannot be too large, since the make-to-order character requires that orders have to be produced in time. This trade-off between setup time efficiency and due-date adherence creates a challenging scheduling problem referred to in the literature as the Customised Stochastic Lot Scheduling Problem. Typically, suppliers reduce the complexity of the production problem by quoting lead times that are equal for all customer families. This choice, however, is in many cases too restrictive. In this paper, we show quantitatively by means of Markov decision processes (MDPs) that using family-dependent lead times can result in a significant gain in profit as compared with using standard lead times. We develop a simple heuristic acceptance/scheduling policy, and demonstrate that this heuristic performs very well compared with the optimal policy of the MDP for a wide range of parameters.
机译:在许多具有批次设置时间的按订单生产的情况下,客户订单被分组为依赖于家庭的批次,以限制由于设置而导致的产能损失。但是,这些批次不能太大,因为按订单生产必须要求必须及时生产订单。建立时间效率和到期日遵守之间的这种折衷产生了一个具有挑战性的调度问题,在文献中称为“定制随机批次调度问题”。通常,供应商通过报价对所有客户家庭都相等的交货时间来降低生产问题的复杂性。但是,这种选择在许多情况下过于严格。在本文中,我们通过马尔可夫决策过程(MDP)定量显示,与使用标准提前期相比,使用家庭依赖的提前期可以显着增加利润。我们开发了一种简单的启发式验收/调度策略,并证明了与多种参数的MDP最优策略相比,这种启发式方法的性能非常好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号