Fuzzy Based Project Time-Cost Optimization Using Simulated Annealing Search Technique

机译:基于模拟退火搜索技术的基于模糊的项目工时优化

获取原文
获取原文并翻译 | 示例
           

摘要

The Project time-cost optimization is inherently a complex task. Because of various kinds of uncertainties, such as weather, productivity level, inflation, human factors etc. during project execution process, time and cost of each activity may vary significantly. The complexity multiplies several folds when the operational times are not deterministic, rather fuzzy in nature. Therefore, deterministic models for time-cost optimization are not yet efficient. It is very difficult to find the exact solution of savings in both time and cost. To make such problems realistic, triangular fuzzy numbers and the concept of α-cut method in fuzzy logic theory are employed to model the problem. Because of NP-hard nature of the project scheduling problem, this paper develops a simple approach with Simulated Annealing (SA) based searching technique. The proposed model leads the decision makers to choose the desired solution under different values of α-cut. Finally, taking a real project, the performance of SA has been tested.
机译:项目时间成本优化本质上是一项复杂的任务。由于项目执行过程中的各种不确定性(例如天气,生产率水平,通货膨胀,人为因素等),每个活动的时间和成本可能会有很大差异。当操作时间不是确定性的,而是本质上是模糊的时,复杂性将增加数倍。因此,用于时间成本优化的确定性模型尚未有效。很难找到节省时间和成本的确切解决方案。为了使此类问题变得现实,采用了三角模糊数和模糊逻辑理论中的α-割方法的概念来对该问题进行建模。由于项目调度问题具有NP难性,本文利用基于模拟退火(SA)的搜索技术开发了一种简单的方法。所提出的模型使决策者在不同的α-cut值下选择所需的解决方案。最后,以一个真实的项目,对SA的性能进行了测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号