首页> 外文期刊>International Journal on Hydropower & Dams >KESH seeks safety upgrades for Komani dam, Albania
【24h】

KESH seeks safety upgrades for Komani dam, Albania

机译:KESH寻求阿尔巴尼亚Komani大坝的安全升级

获取原文
获取原文并翻译 | 示例
           

摘要

Albania's state-owned power producer Korporata Elektroenergjitike Shqiptare (KESH) has issued a general procurement notice for safety upgrades at the Komani hydropower scheme on the Drin river. KESH said in mid-February that the prequalification process for contracts to carry out rockfall protection measures at Komani and consolidation of the dam toe and left bank scour area is expected to begin in the second quarter of this year. The 600 MW Komani plant and 125 m-high dam in northeastern Albania were completed between 1985 and 1998.
机译:阿尔巴尼亚国有电力生产商Korporata Elektroenergjitike Shqiptare(KESH)发布了一份总采购通知,要求对Drin河上的Komani水电计划进行安全升级。 KESH在2月中旬表示,合同的资格预审程序将在今年第二季度开始,该合同将在Komani实施岩崩保护措施以及合并坝趾和左岸冲刷区域的资格预审程序。位于阿尔巴尼亚东北部的600兆瓦Komani电厂和125 m高的大坝在1985年至1998年之间建成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号