...
首页> 外文期刊>International Journal on Hydropower & Dams >Himachal Pradesh commissions the 100 MW Sainj plant
【24h】

Himachal Pradesh commissions the 100 MW Sainj plant

机译:喜马al尔邦委员会是塞恩斯第100工厂

获取原文
获取原文并翻译 | 示例
           

摘要

The 100 MW Sainj hydropower project in the northern Indian state of Himachal Pradesh entered into full commercial service on 12 September, with the commissioning of the second of two 50 MW units. The first unit was commissioned in June. The project was built by Hindustan Construction Company (HCC) under an EPC contract awarded in June 2010 on behalf of owner-operator Himachal Pradesh Power Corporation Ltd (HPPCL). HCC subcontracted the supply of hydro-mechanical equipment to GMW of India, and the electro-mechanical equipment was supplied by Voith.
机译:9月12日,印度北部喜马al尔邦邦的100兆瓦塞因水电项目投入了全面的商业服务,并启动了两个50兆瓦机组中的第二个。第一个机组于6月投入使用。该项目是由印度斯坦建筑公司(HCC)根据业主运营商喜马awarded尔邦电力公司(HPPCL)于2010年6月授予的EPC合同建造的。 HCC将水力机械设备的供应分包给了印度的GMW,而机电设备则由福伊特提供。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号