Obstacles faced in testing commissioning of 231 MW Chamera Hydroelectric Project Stage-III located in Himalayan State, Himachal Pradesh India- A Case Study.

机译:231 MW Chamera水电项目阶段测试和调试的障碍 - III位于喜马拉雅州邦,马偕尔邦印度 - 为例研究。

获取原文

摘要

There were many challenges faced during testing & commissioning of 3x77MW Chamera Hydroelectric Project located in the State of Himachal Pradesh, India. This is an under ground Power Station having 15.99 KM long Head Race Tunnel (HRT) with a gross head of 230m and net head of 200m. All the 3 units of this project were commissioned in a record time of 25 days. Many challenges were encountered during first filling of HRT & commissioning of the project such as leakage in Adits of HRT, leakage from adit to pressure shaft (located inside under ground power house) and leakage of water around the surge shaft area leading to displacement of soil/slides along the hill slope which is inhabited by a small village. Besides the difficulties in completion of civil components, a big incident occurred during the testing & commissioning of the power station in June 2012. There was an accidental application of manual brakes to Unit-1 of the Project which was running on full speed (333 rpm) for heat run test. Actually Brake was to be applied manually to Unit No-3 which was given a stop command during testing process by commissioning team. A young trainee engineer was asked by his Manager during the testing of Unit-3 to go to the generator floor from machine hall and apply brakes to Unit-3 manually. Unit-I was also running on full speed for heat run test. The Engineer Confused Unit-3 for Unit-1 (as the breaking system of all the units is located on generator floor) and applied brakes to Unit-1 instead of Unit-3. There was a big thunder sound and the whole Power House cavern was full of smoke due to carbon dust. Visibility was approximately 20%. Unfortunately the HVAC system was not commissioned which could have taken out the smoke through exhaust. There was heavy suffocation inside the underground power house. It took 10 hrs for the smoke to settle. The whole generator barrel was full of carbon dust.
机译:在印度喜马偕尔邦州的3x77MW Chamera水电项目测试和调试期间面临许多挑战。这是一个下面的地面电站,具有15.99公里长的头赛隧道(HRT),总部头部为230米,净头为200米。该项目的所有3个单位都在25天的记录时间内委托。在首次填充HRT和调试的项目中遇到了许多挑战,例如HRT的Adits泄漏,从Adit泄漏到压力轴(位于地下电源房屋内)和浪涌轴区域的水泄漏,导致土壤位移/沿着山坡幻灯片,由一个小村庄居住。除了民事成分完成的困难之外,2012年6月在发电站的测试和调试期间发生了一项大事。手动制动器对全速运行的项目1件(333rpm) )用于热运行测试。实际制动器将手动应用于单位NO-3,在测试过程中通过调试团队进行停止命令。他的经理在测试期间,他的经理询问了一位年轻的实习生工程师,从机器厅前往发电机地板,手动将制动器施加到单元-3。单元 - 我也在全速进行热运行测试。工程师困惑的单元-3用于单元-1(作为所有单位的断裂系统位于发电机地板上)并将制动器施加到单元-1而不是单元3。有一个巨大的雷声,整个动力屋洞穴因碳粉尘而充满了烟雾。可见性约为20%。不幸的是,HVAC系统未委托,可以通过排气来取出烟雾。地下电力房屋内部窒息。烟雾需要10小时才能解决。整个发电机桶充满了碳粉尘。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号