...
首页> 外文期刊>The international journal on hydropower & dams >Sediment erosion of Francis turbine runners in the Himalayan region of India
【24h】

Sediment erosion of Francis turbine runners in the Himalayan region of India

机译:印度喜马拉雅地区弗朗西斯汽轮机跑步者的沉积物侵蚀

获取原文
获取原文并翻译 | 示例

摘要

Hydropower is the major source of energy in the northern Himalayan belt of the Indian state of Jammu and Kashmir, with an estimated potential of 20 000 MW. Because of the mountainous topology in the region, a large volume of sediment is present in the river water and sediment erosion of hydro turbines a challenging problem for hydro plants in the area. The erosion of the turbine components causes an increase in maintenance related issues, and also a reduction of power generation. This paper presents a detailed comparison of two sediment-laden rivers and the effect on the runners at their respective power stations.
机译:水电是喜马拉雅北部的印度剑道和克什米尔的北喜马拉雅腰带的主要来源,估计潜力为20 000兆瓦。由于该地区的山上拓扑,河水和水力涡轮机的沉积物腐蚀存在大量的沉积物是该地区水电植物的挑战性问题。涡轮部件的侵蚀导致维护相关问题的增加,以及发电的减少。本文介绍了两个沉积物河流的详细比较,以及对各自发电站对跑步者的影响。

著录项

  • 来源
  • 作者

    J.H. Masoodi; G.A. Harmain;

  • 作者单位

    National Institute of Technology Srinagar Turbine Erosion Testing Laboratory Department of Mechanical Engineering Hazratbal 190006 Jammu and Kashmir India;

    National Institute of Technology Srinagar Turbine Erosion Testing Laboratory Department of Mechanical Engineering Hazratbal 190006 Jammu and Kashmir India;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号