首页> 外文期刊>International Journal of Electrical Power & Energy Systems >Modelling the partial planned outages in production costing simulation
【24h】

Modelling the partial planned outages in production costing simulation

机译:在生产成本模拟中对部分计划停机建模

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents two ways of modelling such scheduled maintenance whose length is less than that of the simulation period (called partial planned or scheduled outages in the paper). The present author suggests using modified forced outage rate instead of derated capacity in this case. The effect of the different representations is shown on a very simple numerical example by comparing the loss-of-load probability, the energy not served and the expected energy generations of the units. The paper concludes that the modification of the forced outage parameter of units is more appropriate than derating the capacity.
机译:本文介绍了两种建模方式,这种方式的计划维护的长度小于仿真周期的长度(在本文中称为部分计划或计划停机)。本作者建议在这种情况下使用修改后的强制中断率来代替降额容量。通过比较负载损失概率,未使用的能量和单位的预期能量产生,在非常简单的数值示例中显示了不同表示的效果。本文的结论是,修改机组的强制停机参数比降低容量更合适。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号