...
首页> 外文期刊>International Journal of Electrical Power & Energy Systems >An integrated resource planning model for utilities with quantified outage costs
【24h】

An integrated resource planning model for utilities with quantified outage costs

机译:公用事业的综合资源计划模型,具有中断成本估算

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Integrated resource planning (IRP) for electric utilities involves management planning of supply as well as demand at the same time. In this paper, we develop a mixed integer linear programming model for IRP. The two key distinctions of this model are the incorporation of the forced outage cost and the inclusion of power deficit/surplus. The forced outage cost will more accurately reflect the true cost to a utility, and the power deficit/surplus features well more accurately represent the existence of power deficit/surplus in utilities nowadays. A comprehensive numerical example is provided for illustrative purposes.
机译:电力公用事业的综合资源计划(IRP)涉及供应和需求的管理计划。在本文中,我们为IRP开发了一个混合整数线性规划模型。该模型的两个主要区别是强制停电成本的合并和电力赤字/盈余的纳入。强制停电成本将更准确地反映公用事业的实际成本,而电力赤字/盈余功能则可以更准确地表示当今公用事业中电力赤字/盈余的存在。为了说明目的,提供了一个综合的数值示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号