Maximizing restorable load amount for specific substation during system restoration

机译:在系统恢复期间最大化特定变电站的可恢复负载量

获取原文
获取原文并翻译 | 示例
           

摘要

During power system restoration, the maximum load amount that a substation can pick up at one time is a critical parameter to be determined. Many factors should be considered, such as frequency constraint, transient voltage-dip constraint, steady-state voltage constraint and cold load pickup. This paper proposes a mathematical model for calculating the maximum restorable load amount, in which proper checking methods are presented to deal with these constraints. Frequency deviation is calculated by the average system frequency model. The transient voltage-dip constraint is dealt with by a fast estimation. Cold load pickup characteristics are addressed according to a simple guideline. And a modified bisection algorithm is proposed to solve the complex problem efficiently. The effectiveness is demonstrated by case studies performed on the IEEE 14-bus system and a practical power system.
机译:在电力系统恢复期间,变电站一次可以承受的最大负载量是要确定的关键参数。应该考虑许多因素,例如频率约束,瞬态电压骤降约束,稳态电压约束和冷负载启动。本文提出了一种计算最大可恢复负荷量的数学模型,其中提出了适当的检查方法来应对这些约束。频率偏差由平均系统频率模型计算得出。瞬态电压骤降约束可以通过快速估算来解决。根据简单的指南解决了冷负载的拾取特性。提出了一种改进的二等分算法来有效解决复杂问题。通过在IEEE 14总线系统和实际电源系统上进行的案例研究证明了其有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号