首页> 外文会议>International Conference on Sustainable Power Generation and Supply >Maximum Restorable Load for Substation during Power System Restoration
【24h】

Maximum Restorable Load for Substation during Power System Restoration

机译:电力系统恢复过程中变电站的最大可恢复负载

获取原文

摘要

In power system reconfiguration after successful black start, the maximum restorable load that substation can pick up at one time should be given. Presently, researches about the problem usually concentrate on frequency constraint and steady-state voltage constraint. In this paper, a method that can give the maximum restorable load is proposed which considers transient voltage-dip acceptability (TVDA) as a constraint. Firstly, a two-element table describing the requirements on TVDA for each bus is determined. Secondly, the maximum load restoration model is established which can give the maximum load amount for substation. Some system components, such as generator, inductive motor and network, are simplified with certain precision in order to improve the calculation speed. For improving the convergence speed, the modified dichotomy theorem which includes the improved margin for TVDA is used in the iteration. The proposed method is realized by using Borland C++ Builder and practical Shandong power system is used to verify its validity and effectiveness.
机译:在电力系统重新配置中成功的黑色开始后,应给出变电站可以一次拾取的最大可恢复负载。目前,关于问题的研究通常集中在频率约束和稳态电压约束上。在本文中,提出了一种提供最大可恢应负载的方法,其认为瞬态电压 - DIP可接受性(TVDA)作为约束。首先,确定描述每个总线对TVDA的要求的双元素表。其次,建立了最大负载恢复模型,其可以给出变电站的最大负载量。一些系统组件,例如发电机,电感电机和网络,以某些精度简化,以提高计算速度。为了提高收敛速度,在迭代中使用包括改进的TVDA边距的改进的二分法定理。通过使用Borland C ++ Builder实现所提出的方法,使用实用的山东电力系统用于验证其有效性和有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号