...
首页> 外文期刊>International Journal of Electrical Power & Energy Systems >A queue-based interval-fuzzy programming approach for electric-power systems planning
【24h】

A queue-based interval-fuzzy programming approach for electric-power systems planning

机译:电力系统规划中基于队列的区间模糊规划方法

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In this study, a queue-based interval-fuzzy electric-power system (QIF-ESP) model is developed through coupling fuzzy queue (FQ) theory with interval-parameter programming (IPP). QIF-ESP cannot only handle uncertainties that are presented in terms of fuzzy sets and interval numbers, but also reflect the effects of fuzzy queue on energy resources allocation and system cost. The QIF-EPS model is applied to a case study of planning a regional-scale electric-power system, where two FM/FM/1 (fuzzy exponential interarrival time, fuzzy exponential service time, and one server) queues are incorporated within the modeling framework. Interval solutions with fuzzy arrival and service rates have been generated, which result in different energy resources allocation patterns as well as changed waiting costs and system costs. Compared with the conventional optimization methods, the QIF-ESP model can effectively handle queue problems and multiple uncertainties exist in energy-related processes and activities. Moreover, consideration of queuing problem impacts in the optimization model can provide more useful information for decision makers and gain in-depth insights into the effects of queuing problems for electric-power systems under multiple uncertainties.
机译:在这项研究中,通过将模糊队列(FQ)理论与间隔参数编程(IPP)耦合,开发了基于队列的间隔模糊电力系统(QIF-ESP)模型。 QIF-ESP不仅可以处理以模糊集和区间数表示的不确定性,而且还可以反映模糊队列对能源分配和系统成本的影响。 QIF-EPS模型用于规划区域规模电力系统的案例研究,其中在模型中合并了两个FM / FM / 1(模糊指数到达时间,模糊指数服务时间和一个服务器)队列框架。生成了具有模糊到达和服务费率的时间间隔解决方案,这导致了不同的能源分配模式以及变化的等待成本和系统成本。与传统的优化方法相比,QIF-ESP模型可以有效地处理排队问题,并且在与能源有关的过程和活动中存在多个不确定性。此外,在优化模型中考虑排队问题的影响可以为决策者提供更多有用的信息,并且可以深入了解在多种不确定性下电力系统排队问题的影响。

著录项

  • 来源
  • 作者

    F. Zhao; Y.P. Li; G.H. Huang;

  • 作者单位

    MOE Key Laboratory of Regional Energy Systems Optimization, Sino-Canada Resources and Environmental Research Academy, North China Electric Power University, Beijing 102206, China;

    MOE Key Laboratory of Regional Energy Systems Optimization, Sino-Canada Resources and Environmental Research Academy, North China Electric Power University, Beijing 102206, China;

    MOE Key Laboratory of Regional Energy Systems Optimization, Sino-Canada Resources and Environmental Research Academy, North China Electric Power University, Beijing 102206, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    decision making; fuzzy queuing; interval parameter; electric-power systems; optimization; uncertainty;

    机译:做决定;模糊排队间隔参数;电力系统;优化;不确定;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号