...
首页> 外文期刊>International Journal of Electrical Power & Energy Systems >Comparison between piecewise linear and non-linear approximations applied to the disaggregation of hydraulic generation in long-term operation planning
【24h】

Comparison between piecewise linear and non-linear approximations applied to the disaggregation of hydraulic generation in long-term operation planning

机译:分段线性近似和非线性近似在长期运营计划中应用于水力发电分解的比较

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents a comparison of two proposed approaches to model the hydropower production functions (HPF) applied to long-term operation planning problems. The first approach consists of a non-linear approximation that uses a sigmoid function, and the second approach consists of a piecewise linear approximation. In this study, we aimed to disaggregate the target for each subsystem into individualized generation targets. A study case using the Brazilian power system is presented to evaluate both methodologies. The results show that the piecewise linear approach presents a good approximation with a considerably lower computational time. (C) 2015 Elsevier Ltd. All rights reserved.
机译:本文对两种拟议的方法进行了比较,这些方法可用于对长期运营计划问题进行建模的水电生产函数(HPF)。第一种方法由使用S型函数的非线性逼近组成,第二种方法由分段线性逼近组成。在这项研究中,我们旨在将每个子系统的目标分解为个性化的发电目标。提出了一个使用巴西电力系统的研究案例,以评估这两种方法。结果表明,分段线性方法具有很好的近似性,而计算时间却很短。 (C)2015 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号