...
首页> 外文期刊>International journal of computing science and mathematics >Modelling and solving for ready-mixed concrete scheduling problems with time dependence
【24h】

Modelling and solving for ready-mixed concrete scheduling problems with time dependence

机译:时间相关的预拌混凝土调度问题的建模与求解

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper, we present a formulation for the ready-mixed concrete scheduling problems with time-dependent travel time. Traffic congestion is a major problem for the business of delivering RMC. It may lead to late deliveries of RMC to construction sites, and because RMC is perishable, late deliveries also mean large additional costs for both batch plants and the construction companies. Additional costs caused by traffic congestion can be reduced by taking predictable traffic congestion into account in the process of scheduling. For this purpose we develop a model with consideration of traffic congestion of RMC which uses a heuristic approach based on local search algorithm to solve. A detailed case study based on industrial data is used to illustrate the potential of the proposed approach.
机译:在本文中,我们提出了一种随时间变化的随时间变化的预拌混凝土调度问题的公式。流量拥塞是交付RMC业务的主要问题。这可能会导致RMC延迟交付到建筑工地,并且由于RMC容易腐烂,因此延迟交付还意味着批处理工厂和建筑公司的大量额外成本。通过在调度过程中考虑可预测的交通拥堵,可以减少交通拥堵引起的额外成本。为此,我们开发了一个考虑RMC流量拥塞的模型,该模型使用基于本地搜索算法的启发式方法进行求解。基于工业数据的详细案例研究用于说明该方法的潜力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号