首页> 外文期刊>International Journal of Automation and Logistics >Urban rail transit coordination based on computational experiments
【24h】

Urban rail transit coordination based on computational experiments

机译:基于计算实验的城市轨道交通协调

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

This paper presents a coordination method for subway lines through passenger transfer time computational experiments with artificial transfer stations. The aim of subway lines coordination is minimising passengers' transfer time by tuning train arrival schedules of subway lines at the transfer station. Firstly, the artificial systems of two typical subway transfer stations are established, where the passengers are modelled using social force model. Secondly, computational experiments are executed with the artificial transfer stations taking train arrival time difference of subway lines as the decision variable, which is calculated to minimise passengers' average transfer time in the transfer station. Two type transfer stations are considered in this paper, the average transfer time can be reduced by 5.54% using the optimal coordination solution for subway lines.
机译:通过人工换乘站的旅客换乘时间计算实验,提出了一种地铁线路的协调方法。地铁线路协调的目的是通过调整地铁线路在换乘站的到达时间表,最大程度地减少乘客的换乘时间。首先,建立了两个典型的地铁换乘站的人工系统,其中使用社会力量模型对乘客进行建模。其次,在人工换乘站进行计算实验的基础上,以地铁线路的列车到达时间差为决策变量,计算得出的结果是尽量减少了乘客在换乘站的平均换乘时间。本文考虑了两种类型的换乘站,使用地铁线路的最佳协调解决方案可以将平均换乘时间减少5.54%。

著录项

  • 来源
  • 作者单位

    School of Electronic and Information Engineering, Beijing Jiaotong University,No. 3, Shang Yuan Cun 100044, Beijing, China;

    State Key Laboratory of Rail Traffic Control and Safety,Beijing Jiaotong University,No. 3, Shang Yuan Cun 100044, Beijing, China;

    State Key Laboratory of Rail Traffic Control and Safety,Beijing Jiaotong University,No. 3, Shang Yuan Cun 100044, Beijing, China;

    State Key Laboratory of Rail Traffic Control and Safety,Beijing Jiaotong University,No. 3, Shang Yuan Cun 100044, Beijing, China;

    State Key Laboratory of Rail Traffic Control and Safety,Beijing Jiaotong University,No. 3, Shang Yuan Cun 100044, Beijing, China;

    China Communications Construction Company Limited,No. 85, Deshengmenwai Street 100088, Beijing, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    urban rail transit; subway lines coordination; artificial system; computational experiments;

    机译:城市轨道交通;地铁线路协调;人工系统计算实验;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号