...
首页> 外文期刊>Inside FERC >Ferg Grants Incentive Rates For Two Major Grid Projects Proposed In New England
【24h】

Ferg Grants Incentive Rates For Two Major Grid Projects Proposed In New England

机译:弗格授予新英格兰拟议的两个大型电网项目的激励费率

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

FERC last week conditionally approved incentive rate treatment for the proposed 200 mile, 345 kV Maine Power Connection Project that would provide the first direct link between northern Maine and the rest of the state, and with ISO New England.rnThe commission also granted incentive rates for a $2.1 billion set of grid upgrades and new lines in the New England region, called the New England East-West Solution. The four-part project would add lines and upgrades to the southern New England 345 kV system in Connecticut, Massachusetts and Rhode Island. It is expected to be completed in 2013.
机译:联邦能源管理委员会(FERC)上周有条件地批准了拟议的200英里,345 kV缅因州电力连接项目的奖励税率待遇,该计划将提供缅因州北部与该州其他地区以及与ISO新英格兰之间的第一条直接联系。斥资21亿美元在新英格兰地区进行一系列电网升级和新线路,称为新英格兰东西方解决方案。这个由四部分组成的项目将为康涅狄格州,马萨诸塞州和罗德岛州的新英格兰南部345 kV系统增加线路并进行升级。预计于2013年完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号