首页> 外文期刊>Impact assessment and project appraisal >Targeting the transitions: applying stage-gate~® thinking in strategic environmental assessment
【24h】

Targeting the transitions: applying stage-gate~® thinking in strategic environmental assessment

机译:定位过渡:将stage-gate〜®思想应用到战略环境评估中

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Strategic environmental assessment (SEA) practitioners have a tendency to emphasize assessment phases over the linkages between the phases. Explicitly addressing the transitions between stages could add rigour to SEA processes and make them more structurally robust. There is a considerable body of research on project management practices used by corporations during new product development (NPD). The stage-gate~® model is presented as an example of a successful and innovative NPD approach that is frequently used by various industries, and which addresses the links between assessment phases. Stage-gate theory treats connections between project stages as gates which must be passed. The philosophy behind the stage-gate model is explored as a macro-process that could support current practices in SEA and other types of impact assessment. The stages and gates designed for a proposed Nova Scotia SEA framework are presented to show how stage-gate thinking can be adapted for use in SEA processes. The paper concludes that SEA processes could become more efficient and effective by integrating a philosophy of gated assessments.
机译:战略环境评估(SEA)的从业者倾向于强调评估阶段而不是阶段之间的联系。明确解决阶段之间的过渡可能会增加SEA流程的严格性,并使它们在结构上更加稳健。在新产品开发(NPD)期间,公司对项目管理实践进行了大量研究。介绍了stage-gate〜®模型,此模型是成功创新的NPD方法的一个示例,该方法已在各个行业中广泛使用,并且解决了评估阶段之间的联系。阶段门理论将项目阶段之间的连接视为必须通过的门。阶段闸门模型背后的哲学是作为一个宏观过程而探索的,它可以支持SEA和其他类型的影响评估中的当前实践。介绍了为提议的新斯科舍省SEA框架设计的阶段和大门,以展示如何将阶段大门思维应用于SEA流程中。本文的结论是,通过整合门控评估的理念,SEA流程将变得更加高效。

著录项

  • 来源
    《Impact assessment and project appraisal》 |2015年第2期|126-134|共9页
  • 作者单位

    Faculty of Management, School for Resource and Environmental Studies, Dalhousie University, Kenneth C. Rowe Management Building, 6100 University Avenue, PO Box 15000, Halifax, Nova Scotia, Canada B3H 4R2;

    Faculty of Management, School for Resource and Environmental Studies, Dalhousie University, Kenneth C. Rowe Management Building, 6100 University Avenue, PO Box 15000, Halifax, Nova Scotia, Canada B3H 4R2;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    SEA; stage-gate~®; methodological guidance; framework;

    机译:海;登机口〜®;方法指导;构架;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号