An emergency internal dump procedure and analysis are presented for the 21-MWh engineering test model (ETM) of a full-scale superconductive magnetic energy storage (SMES) coil. The coil is arranged into four modules which can be connected in parallel using cryogenic switches. The first step in the energy dump procedure is to close all switches. The second step is to expel the liquid helium in about 20 to 40 s. As the liquid helium level drops, the current transfers inductively from the uncovered top modules to the other modules. The conductor and parallel structure pieces tend to warm up uniformly with tolerant voltage levels. Two cases are considered: the case where all turns are connected in series (no parallel switching) and the case of the parallel connection of the four modules. A safety analysis of the consequences of a faulty switch is also presented.
机译:针对全尺寸超导磁能存储(SMES)线圈的21兆瓦时工程测试模型(ETM),提出了紧急内部转储程序和分析。线圈分为四个模块,可以使用低温开关并联连接。能量转储过程的第一步是关闭所有开关。第二步是在约20至40 s内排出液态氦。当液氦水平下降时,电流从未覆盖的顶部模块感应地转移到其他模块。导体和平行结构件趋向于以容许的电压水平均匀地预热。考虑了两种情况:所有匝均串联连接(无并联开关)和四个模块并联连接的情况。还介绍了故障开关后果的安全分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号