...
【24h】

Behavior Modification

机译:行为修改

获取原文

摘要

THE ENERGY POLICY ACT OF 2005 HELPED TO ACCELERATE RENEWED industry interest in demand response (DR), “time-based” pricing, and the advanced metering infrastructure (AMI) needed to support them. Much of the recent interest in DR, particularly in areas with organized regional wholesale power markets, has focused on the need for price-responsive demand (PRD) to improve the efficiency of operation of those markets. This author considers PRD to be the most general term for describing consumer demand for electricity that is sensitive to conditions in wholesale markets. This is the case largely because the alternative term “demand response” is often used to refer only to programs offered by independent system operators (ISOs) rather than as a feature of consumer demand that can be initiated by more flexible retail pricing mechanisms. As described below, PRD may be achieved either through retail pricing or DR programs. Historically, economists have argued that more efficient retail electricity pricing that better reflects time-varying wholesale power costs will improve economic efficiency, thus producing resource cost savings and enhanced customer value when compared with traditional fixed prices. However, a lack of state regulatory encouragement and utility initiative, along with concerns about metering costs and effects on consumers, has delayed the widespread adoption of dynamic, time-based pricing. Partly as a result of this inaction at the state level, most recent attention regarding PRD has focused on DR programs offered through regional ISOs like PJM, the New York ISO, and ISO New England.
机译:2005年的《能源政策法案》有助于加速重新出现的行业对需求响应(DR),“基于时间”的定价以及支持它们的先进计量基础架构(AMI)的兴趣。最近对灾难恢复的兴趣,尤其是在具有组织化区域批发电力市场的地区,已将重点放在对价格敏感需求(PRD)的需求上,以提高这些市场的运营效率。作者认为PRD是描述消费者对批发市场条件敏感的电力需求的最通用术语。出现这种情况的主要原因是,替代术语“需求响应”通常仅用于指代独立系统运营商(ISO)提供的程序,而不是可以通过更灵活的零售定价机制启动的消费者需求的功能。如下所述,PRD可以通过零售定价或DR计划来实现。从历史上看,经济学家认为,与传统的固定价格相比,更有效地零售电价能更好地反映随时间变化的批发电价将提高经济效率,从而节省资源成本并提高客户价值。但是,由于缺乏州政府的鼓励和公用事业计划,加上对计量成本及其对消费者的影响的担忧,延迟了基于时间的动态定价的广泛采用。部分由于州一级无所作为的结果,有关PRD的最新关注已集中在通过地区ISO(例如PJM,纽约ISO和ISO新英格兰)提供的灾难恢复计划上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号