首页> 外文期刊>IEEE Computer Applications in Power >Implementation of R&D projects on an energy management system
【24h】

Implementation of R&D projects on an energy management system

机译:在能源管理系统上实施研发项目

获取原文
获取原文并翻译 | 示例
       

摘要

The problems encountered in transferring the technology of external R&D projects on the energy management systems (EMS) at Niagara Mohawk Power Corporation are addressed. The need for a general-purpose external applications support interface to an EMS is argued, and an attempt is made to define the requirements for such an interface, eliminating the recurring need for modifying the EMS software to accommodate external products. The interface would provide transparent access to external applications by the EMS and vice versa as well as the ability to initiate program execution in the peer system. The transparency of access encompasses transparency of data location, data structure, and data organization. These objectives suggest the possibility of a two-component interface, where the communications component handles request and data interpretation.
机译:解决了在尼亚加拉莫霍克电力公司将外部研发项目的技术转移到能源管理系统(EMS)时遇到的问题。提出了对EMS的通用外部应用程序支持接口的需求,并尝试定义该接口的要求,从而消除了为适应外部产品而不断修改EMS软件的需求。该接口将提供EMS对外部应用程序的透明访问,反之亦然,以及在对等系统中启动程序执行的能力。访问的透明性包括数据位置,数据结构和数据组织的透明性。这些目标表明了由两部分组成的接口的可能性,其中通信组件负责处理请求和数据解释。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号