首页> 外文期刊>IEEE Computer Applications in Power >Planning system operations to meet NO/sub x/ constraints
【24h】

Planning system operations to meet NO/sub x/ constraints

机译:规划系统操作以满足NO / sub x /约束

获取原文
获取原文并翻译 | 示例
           

摘要

How Southern California Edison modified its operating practices to meet NO/sub x/ constraints is described. To measure NO/sub x/ levels on a real-time basis, continuous emissions monitoring systems were installed at major gas plants. To capture the impact of NO/sub x/ constraints, a program was developed to assist operating personnel in formulating NO/sub x/-compliance strategies. System costs and benefits and future plans are detailed.
机译:描述了南加州爱迪生公司如何修改其操作规范以满足NO / sub x /限制。为了实时测量NO / sub x /的水平,大型煤气厂安装了连续排放监测系统。为了捕获NO / sub x /约束的影响,开发了一个程序来协助操作人员制定NO / sub x /遵守策略。详细说明了系统成本和收益以及未来计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号